Day 2 saw rapid progress. 10 men worked from 7 in the morning non-stop until it was dark.
   
Each log has to be lifted into position indavidually to sit up on top of the last one.

Each log has a layer of insulation stabled between it and it's neighbour.
   
A satisfying end to day 3.
   