| Stage 3 |
 |
| |
 |
Day 2 saw rapid progress. 10 men worked from 7 in the morning non-stop until it was dark. |
| |
|
 |
Each log has to be lifted into position indavidually to sit up on top of the last one.
Each log has a layer of insulation stabled between it and it's neighbour. |
| |
|
 |
A satisfying end to day 3. |
| |
|
|
|
 |
 |