|
 |
| Stage 2 |
 |
| |
 |
Loads and... |
| |
|
 |
Loads and... |
| |
|
 |
Loads of timber was taken off and stacked up. |
| |
|
 |
On the 23'rd of Febuary 2004, The log company, Rural Accommodations arrived to lay the logs.
Like all things preparation takes a bit of time and so the first day was spent getting the base logs correctly aligned. |
|
|